Versand
Industrial Machinery Shipping & International Delivery Policy
Effective Date: October 2026
Manufacturer & Exporter: Guangdong Nalanke Ultrasonics Technology Co., Ltd. (Brand: LANANK)
Guangdong Nalanke Ultrasonics Technology Co., Ltd. routinely exports heavy-duty ultrasonic plastic welders, linear vibration friction welders, wire harness metal welders, and precision titanium tooling to over 40 countries across North America, Europe, Southeast Asia, and Latin America. We operate standardized industrial export packaging and logistics protocols.
1. Industrial Export Packaging Standards (ISPM 15 Compliant)
To guarantee zero mechanical or electrical damage during transoceanic transit, all machinery and heavy equipment adhere to rigorous export crating standards:
- Fumigated Solid Plywood Crating: 100% compliant with International Standards for Phytosanitary Measures No. 15 (ISPM 15) for hassle-free customs entry into the United States, European Union, Japan, and Australia.
- Internal Shock & Corrosion Protection: Machines are mounted on reinforced internal wooden base skids, anchored with steel brackets, and wrapped in heavy-duty vacuum moisture-barrier foil containing industrial desiccant packs.
- Acoustic Tooling & Spares: Sonotrodes, piezoelectric transducers, and boosters are packaged in custom-cut, high-density EVA shock-absorbing foam containers.
2. Standard Lead Times
- Standard Ultrasonic Welders (15kHz / 20kHz / 35kHz): 5 to 7 business days (following 72-hour full-load FAT burn-in testing).
- Custom Titanium Sonotrodes & Lower Fixtures: 3 to 5 business days (including ANSYS FEA acoustic modal simulation and trial welding).
- Heavy-Duty Linear Vibration & Spin Welders: 15 to 25 business days.
- Custom Multi-Station Automated Systems: 25 to 40 business days (including mechanical CAD sign-off, PLC programming, and safety enclosure integration).
3. International Freight Modes & Incoterms
We support flexible international commercial trade terms according to buyer preference:
- Supported Incoterms: FOB (Shenzhen / Guangzhou), CIF / CFR (to any major global seaport or airport), EXW (factory pick-up), and DDP / DAP (door-to-door delivery with customs clearance).
- Air Express (DHL / FedEx / UPS / Air Cargo): Recommended for rapid delivery of trial welded samples, spare parts, ultrasonic generators, and custom horns (typical transit: 3 to 6 business days).
- Ocean Freight (FCL / LCL Container): Recommended for standard machine columns, rotary automation stations, and vibration friction machines (typical transit: 12 to 28 days depending on global destination).
4. Export Documentation & Customs Clearance
Every commercial shipment includes complete, verifiable trade documentation dispatched digitally and physically attached to the crate:
- Commercial Invoice & Detailed Packing List
- Clean on Board Ocean Bill of Lading (B/L) or Air Waybill (AWB)
- CE Declaration of Conformity (Machinery Directive, Low Voltage, EMC)
- Certificate of Origin (CO / Form E / Form A upon request for tariff reduction)
- Factory Quality Inspection & Electrical Safety Sign-off Report
5. Logistics & Dispatch Inquiries
To obtain ocean/air freight estimates, container load plans, or dispatch status:
Email: sales@ultralanank.com
Logistics Desk WhatsApp: +86 139 2557 7713
Factory Address: No. 4, Lane 1, Wuhua Road, Dutou New Village, Duanzhou District, Zhaoqing City, Guangdong Province, China (Postal Code: 526000)